Is the 14 month timeline starts from AOR or IRB referral?
I applied inside Canada, Toronto city and my timeline:
May 11th 2023 case confirmation
June 17th 2023 1st interview/passport seize
July 7th 2023 Work permit
Sep 14th 2023 2nd interview/brown paper/IRB referral (Toronto)
15th Sep 2023 BOC submission to IRB
May 23 2024 ICAC disclosure package sent to IRB ☒ Regular Hearing: Half-Day (3 hours) with no Minster intervention (Disclosure of documents from the Integrated Claim Analysis Centre )
Is the 14 month timeline starts from AOR or IRB referral?
I applied inside Canada, Toronto city and my timeline:
May 11th 2023 case confirmation
June 17th 2023 1st interview/passport seize
July 7th 2023 Work permit
Sep 14th 2023 2nd interview/brown paper/IRB referral (Toronto)
15th Sep 2023 BOC submission to IRB
May 23 2024 ICAC disclosure package sent to IRB ☒ Regular Hearing: Half-Day (3 hours) with no Minster intervention (Disclosure of documents from the Integrated Claim Analysis Centre )
Doesn’t actually matter since there is huge variability in wait time for hearings so 14 months is not actual a true wait time. Some get much faster processing while many others take a lot longer than 14 months. Given the growing number of asylum claims time to hearing is going to get longer.
Yes it is faster at those provinces, I regret a lot that I didn't submit my claim one of those provinces. People told me that it is a "FEDERAL PROCESS" what a bs.