Any march applicant out there, March 2011, who have got DMs yet? I applied in March 2011, got Medical + RPRF + PCC request in November 2011. Submitted everything in December 2011. RPRF encashed in January 2012 and then a further PCC request came in February 2012..all submitted and now waiting..still waiting..
Congrats Manek. It is jsut a matter of time nowfor you to get your PPs back with stamping. Usually the stamping happens three days before the update of "DM" is made.
DM after MR+RPRF +PPR is a possitive sign .Congrats to all those who have reached this stage.
@manek, ur time lines show that u had applied in 2010-prejune,yet u have catagorised urself under SW2. I RECKON,U HAVE MISTAKABLY WITTEN 2010 INSTEAD OF 2011.
Anyways,wish u would receive ur PP with mapple leave nd COPR,VERY SOON !!
GOD BLESS ALL !!!!
parhar51
DM after MR+RPRF +PPR is a possitive sign .Congrats to all those who have reached this stage.
@ manek, ur time lines show that u had applied in 2010-prejune,yet u have catagorised urself under SW2. I RECKON,U HAVE MISTAKABLY WITTEN 2010 INSTEAD OF 2011.
Anyways,wish u would receive ur PP with mapple leave nd COPR,VERY SOON !!
GOD BLESS ALL !!!!
parhar51
THANX,SIR, for correcting me.
I appreciate u for the same. At times,we hold incorrect notion or our interpretation is not exactly what it really ought to be.Forum members,by way of each other's help,put the things at the right place.
Wish u nd ur family all the best !!
GOD BLESS ALL!!!!
parhar51
Don ask me bro.... as soon as i reach home i open ecas... and keep refreshing it hourly...
sunday tho i was online allday... i was sick seeing in process
when will our day come????
Don ask me bro.... as soon as i reach home i open ecas... and keep refreshing it hourly...
sunday tho i was online allday... i was sick seeing in process
when will our day come????
what i think......Our medicals have been updated, RPRF encashed......only part left hence is Security Check......and i have heard these people don't need passport to do security check.....Like London Visa Office only send passport request when everything has been done and they return passport once received by them in couple of days.
NDVO is few among CHC's which sends passport request along with medicals and RPRF.
Conclusion as per my assumptions and i might be wrong might be right......Our file is in queue probably for Visa stamping...and wait will be over by Gods grace very soon