Hi i am fsw inland
My aor is aug 2015.. my status also changed to not needed after submitting schedule a doc.
It has been same since nov 24.
I see lot of oct nov aor people getting panicked...which they should now
Hi i am fsw inland
My aor is aug 2015.. my status also changed to not needed after submitting schedule a doc.
It has been same since nov 24.
I see lot of oct nov aor people getting panicked...which they should now
Im FSW Outland (AOR 11/16) and my BG changed from Not Started to Not Needed on 12/10. No documents requested or anything. One thing is, Im applying from US so Im also processed at CPC-Ottawa, same as other Inlanders. Not sure whether this is relevant.
I added myself to this list.
My timeline is:
Submission date nov 19
AOR Date nov 19
Medical Passed dec 2
BG in Process dec 2
BG Not needed at this time dec 15
I added myself to this list.
My timeline is:
Submission date nov 19
AOR Date nov 19
Medical Passed dec 2
BG in Process dec 2
BG Not needed at this time dec 15
so far it looks like BG check status change is happening on different dates, not at the same day. It means that this is not any kind of technical issue. Maybe it means bg check is getting approved this way? Average amount of time between BG check 'in progress' and 'no need' is about 2-3 weeks for everyone. Hopefully our BG checks are passed =)
Btw guys, if your BG check is in progress, does that mean your ECAS is in process as well? I just have no accees to ECAs and never had it, so I was just wondering if my ECAS would be in process or not
Btw guys, if your BG check is in progress, does that mean your ECAS is in process as well? I just have no accees to ECAs and never had it, so I was just wondering if my ECAS would be in process or not