Do you know about your Bd or CC charged or not, I have send mine 18 march, I don't know yet whether they received my application or not.I send mine application with normal post, now think that was the biggest mistake I have done in my life. Keep touch.
Thanks all for your reply,
I paid the fee by Demand Draft, so I cannot check whether they have charged me or not, let me wait till the end of this month and see what happens.
My Visa Office is London please share your Visa Offices.
Thanks
Seems I am a bit late but never mind as I am also one of March applicants with following status:
Application sent: 04.03.2011
PER Received : 11.04.2011 (Almost after 40days)
I hope it'd help other to guess arrival of their PER.
And in my understanding (& feedback from forum members), PER issuing time has become much shorter now.
Do you know about your Bd or CC charged or not, I have send mine 18 march, I don't know yet whether they received my application or not.I send mine application with normal post, now think that was the biggest mistake I have done in my life. Keep touch.
hello russell2011. mine was also sent march 17, we have same timeline then. Until now I havent heard from my agency if reply was already received. I will post right away if ever there is good news.
Although I am part of the chain but I guess starting any thread on monthly basis would create a mess and it'd be far better if we bring our inputs to already existing live/active threads.
And even if it's still required to have something of one's own, a thread must be better based on VO basis as every VO differs in its requirements, visa issuing process and hence the challenges it poses to its applicants...this seems more viable and constructive approach than starting monthly threads.
Although I am part of the chain but I guess starting any thread on monthly basis would create a mess and it'd be far better if we bring our inputs to already existing live/active threads.
And even if it's still required to have something of one's own, a thread must be better based on VO basis as every VO differs in its requirements, visa issuing process and hence the challenges it poses to its applicants...this seems more viable and constructive approach than starting monthly threads.
Gulp....Mr Rana, is your NOC number correct in your information? It says 7126, but the closest to that in the NOC 29 is 7216 Contractors and Supervisors, Mech Trades. Going by your excellent PER results I am sure it was just a slip of the fingers....
Hi Wicky,
Presently, it takes nearly one month to get reply from CIO.
Mean while you can make sure that your check/credit card is charged indicating review has started.
Hope you get a reply by April 29th.
Good luck
Good luck.
My application was received on march 23, 2011. let's keep the thread alive with information.
my visa office new delhi
from what I have read here in the forum ...waiting time is long...lets us keep each other informed