Sadly, not much since my ADR submission (for PCC). I called them a few times, last call they mentioned that eligibility is passed, security & criminality still in progress. I suspect my lots of travels (and I lived in Ireland in the last 10 years, so needed another PCC), is causing delays.
However, I know this is going to sound weird, but it doesn't matter too much, as long as I get my PPR by December

.
I planned a holiday in Mexico over Christmas, and since the PR cards now take 70 days (which is during Christmas if I would land today), I am not too eager for getting my PPR fast now. I applied for the Bridging work permit and I'm planning to have my "landing" when I come back from that Mexico trip. So basically my plan is to use my bridging permit until Christmas, then hopefully my PR is finally done in December so I can land when I return, and finally become a PR!