AdUnit Name: [AboveMainContent]
Enabled: [Yes],
Viewed On: [Desktop],
Dimensions: [[728,90],[970,250],[300,250]]
CampaignId: [/22646143967/candadavisa/ForumHeaderGeneric],
forumSection: Immigration to Canada, subForumSection: Express Entry / Expression of Interest
Early October.
Probably before 10th.
It's very annoying to wait with endless frustation
My documents got delivered on 12 SEP..wen can I expect t process to get completed
My documents got delivered on 12 SEP..wen can I expect t process to get completed
6 months from the date of delivery of your docs. This is as per current timelines.
Dear friends,
It's done, Fluctuating stage, thanks to
@rajapanesar I'v downloaded it.
Master's degree, as expected.
THANK YOU so much everyone for keeping this thread going!!! I would have gone crazy through this waiting time without you, guys.
My updated timeline is in signature below.
Hi i guys i sent my transcripts on june 22 and it was delivered by july 1st. and it still says "in process" what do i need to do? or should i sit back and wait.
Do you mean submitted?
Guys, I need your advise.
I completed my PG diploma in instructional design from Symbiosis Center for distance learning (SCDL) in academic year 2017-18. This academic year SCDL was recognised by UGC.
My IQAS assessment is put on hold and a letter from AICTE is demanded from me. The letter should state that instructional design course is accredited or recognised by AICTE.
I am completely confused what to do. At first I shared them UGC recognition proofs, but they want AICTE recognition letter for this particular course.
Please guide how can I overcome this hurdle. What should i do to get this letter. Has anyone before got into such situation and came out of it. Please reply.
Guys, I need your advise.
I completed my PG diploma in instructional design from Symbiosis Center for distance learning (SCDL) in academic year 2017-18. This academic year SCDL was recognised by UGC.
My IQAS assessment is put on hold and a letter from AICTE is demanded from me. The letter should state that instructional design course is accredited or recognised by AICTE.
I am completely confused what to do. At first I shared them UGC recognition proofs, but they want AICTE recognition letter for this particular course.
Please guide how can I overcome this hurdle. What should i do to get this letter. Has anyone before got into such situation and came out of it. Please reply.
Check with Symbiosis administration. They must be having some proofs
Check with Symbiosis administration. They must be having some proofs
Did that. Sent the IQAS assessment consultant proof of recognition...but still the same revert. Need AICTE accredition.
Did that. Sent the IQAS assessment consultant proof of recognition...but still the same revert. Need AICTE accredition.
Check AICTE website if there is such a list.
@Vaibhav_1989 received his report for SCDL.Check with him as well
I have been reading like hell. Explored AICTE website, UGC website, IQAS Website. They all say unanimously AICTE is body for technical education and UGC for higher education. I still don't know despite of me sending UGC document approving SCDL to conduct instructional design cource through online distance learning model, the assessment consultant is throwing the ball in AICTE's net and stating that is the IQAS policy.
For those whose documents were delivered to IQAS in June, this is to let you know that they have started working on June deliveries.
Mine got there on the 4th of June and my AOR1 came yesterday though I didn't notice it till this evening.
Funny thing is that IQAS sent another mail same yesterday requesting my transcripts. I don't get why though because everything was sent in the same envelope. Patiently waiting till Monday so that I can know what their issues are.
Is iqas website for tracking application status down?
Funny thing is that IQAS sent another mail same yesterday requesting my transcripts.
This was AoR1.
The other mail was AoR2. The process will be completed in first week of November.
This was AoR1.
The other mail was AoR2. The process will be completed in first week of November.
Oh really? Wow! Thank you for letting me know, at least my mind can be at rest now. Thank you so much
Is iqas website for tracking application status down?
It's up and running now.
AdUnit Name: [BelowMainContent]
Enabled: [No],
Viewed On: [Desktop],
Dimensions: [[728,90],[300,250]]
CampaignId: [/22646143967/candadavisa/ForumHeaderGeneric],
forumSection: Immigration to Canada, subForumSection: Express Entry / Expression of Interest