Hi all, is there anyone applied from UAE as my application is stuck at IP1 from mid-April and as per Immitracker nearly all April AOR UAE-Residence application are at IP1.
Does country of residence places a role in fastening the process ?
Hi all, is there anyone applied from UAE as my application is stuck at IP1 from mid-April and as per Immitracker nearly all April AOR UAE-Residence application are at IP1.
Does country of residence places a role in fastening the process ?
LVO us only involved with eligibility and security. However, in some cases even eligibility and security may be done at CPC, and only the finalization and PPR is done by LVO. Depends on workload distribution. But the general trend is final eligibility and security at LVO.
FSWO Family of 3
AOR 24th April
MEP/IP1 2nd May
IP2 29th June
I find it weird to move to IP2 while I still didn't get the request to pay rprf as I didn't pay upfront, is this usual @legalfalcon ?? Please let me know if you are in the same situation. Thanks
Hi legalfalcon, thanks for your feedback. As I can see you have far better insight about the express entry program, is it normal for UAE residence application to take so much time to even pass the IP1 stage.
Hi legalfalcon, thanks for your feedback. As I can see you have far better insight about the express entry program, is it normal for UAE residence application to take so much time to even pass the IP1 stage.
I have over and over stated that tracking your application with MyCIC status is the most horrible thing you can do and get stressed. All applications fo through the following:
R10
Criminality
Medicals
Eligibility
Security
The eligibility is the most crucial stage and the preliminary eligibility takes pace at CPC or CIO for most applicants. Then the finalization is done at LVO. This is where the delay happens, and it will depend on the LVO. Some LVOs are very slow.
However, if you want to know the stage your application is at, you should consider requesting GCMS, alternatively you can wait it out.
I have over and over stated that tracking your application with MyCIC status is the most horrible thing you can do and get stressed. All applications fo through the following:
R10
Criminality
Medicals
Eligibility
Security
The eligibility is the most crucial stage and the preliminary eligibility takes pace at CPC or CIO for most applicants. Then the finalization is done at LVO. This is where the delay happens, and it will depend on the LVO. Some LVOs are very slow.
However, if you want to know the stage your application is at, you should consider requesting GCMS, alternatively you can wait it out.
Hi legalfalcon, I am so sorry for that query of mine but as I am not that active on this forum so I missed your previous comments. Thanks a lot for your feedback as it is quite informative. Hope I get the golden mail asap.