@duckhira a quick question. Did you use the same experience letters for SINP and CIC application? I read somewhere a PNP applicant was rejected due to not enough description on their work experience letter. Scary!
@duckhira a quick question. Did you use the same experience letters for SINP and CIC application? I read somewhere a PNP applicant was rejected due to not enough description on their work experience letter. Scary!
Same work experience letters for previous companies, and almost same letter from present company, just I changed the date of issue before submitting eAPR.
Package returned from Accra...With Visas and 2 Copies of COPR......Thanks House though i joined late...Spent much time learning in stealth mode......Wish those awaiting PPRs good and speedy luck.....Timelines below
FSW ( Express Entry) CONDITION MET (467 points for October 2nd 2015 Round of invitation pegged at 450)
ITA: 2nd Oct
AOR: 29th Nov
Medicals passed: Dec 3rd 2015
IELTS Request: 4th Dec 2015
Schedule 4 and 4a: 7th Dec 2015
Schedule A: 11th Dec 2015
BG changed to in progress: 27th Jan 2016
COA Email: 29th Jan 2016
PPR + IMM 5406 request: Feb 9th 2016
PP sent: 10th Feb 2016
PP + COPR received: 26th Feb 2016
Express Entry Timeline:
NOC: 2171
ITA: 18th dec 2015
AOR: 22th Jan 2016
Schedule A Request: 25th jan 2016
Schedule A Submitted: 26th jan 2016
Meds Passed: 30th Jan 2016
Background check :NOT NEEDED
Express Entry Timeline:
NOC: 2171
ITA: 18th dec 2015
AOR: 22th Jan 2016
Schedule A Request: 25th jan 2016
Schedule A Submitted: 26th jan 2016
Meds Passed: 30th Jan 2016
Background check :NOT NEEDED
I was just thinking. ....and of cos this is all speculation. ..i think most files have been forwarded to the local VO and speed now depends on the work load of the VO....using the fact that the 3 January guys that got ppr had their VO in india...so maybe AVO just needs more time considering the countries they cover. ...idk....
I was just thinking. ....and of cos this is all speculation. ..i think most files have been forwarded to the local VO and speed now depends on the work load of the VO....using the fact that the 3 January guys that got ppr had their VO in india...so maybe AVO just needs more time considering the countries they cover. ...idk....
Thanks so much saskmydream....I wasn't scheduled for the February session eventually...But i have a date in March. Once you get COA based on trend i believe PPR is almost here....Trusting God for you too....Thanks for the message.....