My AoR is June 12, 2019. For the photographs to be uploaded for eAPR, I took the photos on May 19, 2019 as per IRCC specifications and the studio was very well aware of the specs too. Hence they provided the soft-copy of the photograph along with 4 hardcopies.
Now, I have received by PPR Email and I am about to submit the passport and photographs. Then, I realized the photograph is gonna be older than 6 months by tomorrow. As per IRCC Specifications, the photograph should be taken within the past six (6) months. What Should I be doing now? Change the date in the back of the photo to June 5 around or something or should I be clicking a new photograph?
My AoR is June 12, 2019. For the photographs to be uploaded for eAPR, I took the photos on May 19, 2019 as per IRCC specifications and the studio was very well aware of the specs too. Hence they provided the soft-copy of the photograph along with 4 hardcopies.
Now, I have received by PPR Email and I am about to submit the passport and photographs. Then, I realized the photograph is gonna be older than 6 months by tomorrow. As per IRCC Specifications, the photograph should be taken within the past six (6) months. What Should I be doing now? Change the date in the back of the photo to June 5 around or something or should I be clicking a new photograph?
The PDF in the PPR email only say that the photo should reflect the current appearance (that it should be taken with 6 months). My photographs adhere to the dimensions but, the timeline is my concern.
The PDF in the PPR email only say that the photo should reflect the current appearance (that it should be taken with 6 months). My photographs adhere to the dimensions but, the timeline is my concern.