Called IRCC again and they said no movement from my application since the last time I checked. I dont know how long was I already in the "review required" part of the eligibility check. I can only find out once I get my GCMS. Agent said to call by end of September for updates.
I'll just try to go on and not open my account every day and not open the forum every day and read through

. Im happy for those who got PPR in the Feb AOR crew, but man, the anxiety just keeps piling up as I didnt see any movement in my application since April 5 (day I paid RPRF). At this point, I guess I just have to accept that I dont have any control in the situation and just got to trust the process.
Have a lovely weekend to all. May they shower golden emails upon us very soon!
FSW-O | VO: Ottawa | AOR: 06Feb2019 | ADR: Schedule A 21Mar2019 | MEP: 25Mar2019 | Biometrics: 30Mar2019 | RPRF: 05Apr2019 | Eligibility review required: ???